ARCVIEWALUMINIUM SYSTEMS
Aluminium curtain wall façade engineered for high wind loads

Buyer tools · Code compliance

Will these windows pass in my project?

Choose the city and building. We derive the wind, water and energy requirements in your local standard's own terms, check every ARCVIEW system against them and give you a summary your certifier or consultant can review.

12
countries
106
cities & regions
5
systems checked

Project location

Country
City / region

Building

Building height2 storeys≈ 6 m
110 · 30 m30 · 90 m60 · 180 m
Terrain / exposure
Use
Project

Optional requirements

Noise exposure
Security
Bushfire attack level · AS 3959
Results update live

Indicative requirements

Sydney, Australia

2 × 3 m = 6 m · Suburban · Residential · New build

AS/NZS 1170.2 TC3, Ms 0.95

5 Pass0 Conditional0 Not suitable

Wind load

AS 4055 / AS 2047

N2

500 Pa · 10.4 psf

Design pressure
500 Pa
Ultimate
1,000 Pa

AS 4055-2021 · AS/NZS 1170.2:2021 · AS 2047-2014

Water tightness

AS 2047

N2

150 Pa · 3.13 psf

Test pressure
150 Pa
%
30 % · N2

AS 2047-2014 Table 2.1

Energy

NCC 2022 climate zone 5 · Class 1/2 DTS glazing

≤ 4.00

Max. Uw W/m²K

Max. solar factor (g / SHGC)
≤ 0.5

Typical value — whole-building method

NCC 2022 Vol. 1 Section J / Vol. 2 H6 · NatHERS · WERS

  • There is no mandatory per-window limit here — compliance is assessed for the whole building. The figure shown is the typical value used to pass.

Indicative — not a certificate. These figures are simplified from the cited standards for early product selection. Topography, building shape, local amendments and project specifications can change them. Always verify with your structural engineer, certifier or façade consultant before ordering.

02 — System matrix

Which ARCVIEW systems pass

Every system is compared with its tested values. The recommended glass is the most economical glass and spacer combination that meets the energy limit at the standard reference size.

5 pass · 0 conditional · 0 not suitable

Lift & slide doors

ARC-S90 / S120 Slim

Pass
Wind

N4 / C1

Need: N2

Water

900 Pa

Need: 150 Pa

Energy · glass

Uw 1.55 · g 0.23

Need: Uw ≤ 4.00 · g ≤ 0.5

Recommended glassDouble solar-control Low-E · aluminium spacer

Casement & tilt-turn windows

ARC-C70 / C80 Thermal

Pass
Wind

N5 / C2

Need: N2

Water

1,050 Pa

Need: 150 Pa

Energy · glass

Uw 1.47 · g 0.41

Need: Uw ≤ 4.00 · g ≤ 0.5

Recommended glassDouble Low-E, argon · aluminium spacer

Bi-fold doors

ARC-F68 / F80 Heavy

Pass
Wind

N3

Need: N2

Water

300 Pa

Need: 150 Pa

Energy · glass

Uw 1.84 · g 0.44

Need: Uw ≤ 4.00 · g ≤ 0.5

Recommended glassDouble Low-E, argon · aluminium spacer

Curtain wall

ARC-CW150 Stick / Unitized

Pass
Wind

C4

Need: N2

Water

1,500 Pa

Need: 150 Pa

Energy · glass

Uw 1.24 · g 0.26

Need: Uw ≤ 4.00 · g ≤ 0.5

Recommended glassDouble solar-control Low-E · aluminium spacer

Pivot & entrance doors

ARC-P100 Monolith

Pass
Wind

N3

Need: N2

Water

300 Pa

Need: 150 Pa

Energy · glass

Uw 1.38 · g 0.21

Need: Uw ≤ 4.00 · g ≤ 0.5

Recommended glassDouble solar-control Low-E · aluminium spacer

03 — Beyond the numbers

Also required for Australia

Documents, labels and approvals your inspector or consultant will ask for. Where we hold a matching test report, it is linked.

  • AS 2047 label on every window

    The label shows the manufacturer, rating (N/C class, SLS, ULS, water) and product; certifiers check it on site.

    AS 2047-2014 §9 · NCC 2022 H2D7 / J4D

    Our test reports:AS 2047 & WERS

  • Safety glazing in critical locations

    Doors, side panels and low-level glass need toughened or laminated safety glass to the local standard.

    AS 1288-2021 · AS/NZS 2208

  • NCC energy: NatHERS / WERS

    Your energy assessor needs certified Uw and SHGC values (WERS) for the NatHERS or DTS glazing calculation.

    NCC 2022 · NatHERS 7-star · WERS

    Our test reports:AS 2047 & WERS

Wind load
AS 4055-2021 · AS/NZS 1170.2:2021 · AS 2047-2014
Water tightness
AS 2047-2014 Table 2.1
Energy
NCC 2022 Vol. 1 Section J / Vol. 2 H6 · NatHERS · WERS

Next step

Take it to your certifier

Download a branded compliance summary with the requirements, sources, system matrix and assumptions — or send the project to our engineers for a free review against your drawings.

Free · reply within 1 business day

04 — FAQ

Code compliance questions

No. It is an indicative pre-design check to choose the right system and glass early. Your engineer sets the final design pressures; your certifier or consultant approves products against test reports. We supply those reports, stamped calculations and labels per project.

Request a quote

Send us your drawings. Get a factory price in 48 hours.

Tell us about your project and an export manager will reply with system recommendations, an itemised quotation and lead time — free, with no obligation.

  • Reply within 24 hMonday–Saturday, in English, Spanish, French or Arabic.
  • Itemised quote in 48 hPer-unit pricing, glass & hardware specs, window schedule.
  • Prefer WhatsApp?Message us with your drawings — we read PDFs and DWGs.
I am a
Attach drawings (optional)

We never share your details or drawings. Privacy policy

Get a factory quote in 48 h